Establishing fuel stations in Saudi Arabia

We build fuel stations across the Kingdom of Saudi Arabia on a turnkey basis — from site study and design through to final commissioning — in compliance with the approved technical regulations and requirements, handing over a complete station that is ready to operate.

Delivery modelTurnkey: design, build and commission
Regulatory referenceTechnical requirements approved in the Kingdom
Handover conditionStation tested and ready for operation

What building a fuel station covers

  • Studies and design
  • Infrastructure
  • Fuel tanks and piping networks
  • Civil and architectural works
  • Electrical and mechanical systems
  • Coordination with the competent authorities

Station delivery stages

  1. Studies and planning

  2. Infrastructure works

  3. Tanks and piping networks

  4. Civil and architectural works

  5. Electrical and mechanical systems

  6. Finishes, testing and handover

     

Quality, safety and testing

  • Pressure testing
  • Leak protection
  • Fire and alarm systems
  • Material conformity
  • Programme discipline

What the client receives

  • Drawing package
  • Test records
  • Regulatory documents
  • A station ready to operate

Questions clients ask

Does the service include design and coordination with the competent authorities?
Yes. We start from the site study and the preparation of the engineering, architectural, structural and electromechanical drawings, then coordinate with the competent authorities to satisfy the regulatory requirements before construction starts.
How is the integrity of the tanks and piping networks confirmed?
Tanks are supplied and installed to the approved specifications, the networks are executed with their insulation and leak-protection systems, and pressure tests are then run to verify the integrity of every connection.
Are the electromechanical works carried out under the same contract?
Yes. The works include the fuel dispensers and control systems, electrical and lighting installations, ventilation and air conditioning, and the fire-fighting, alarm and security surveillance systems, all within the turnkey scope.
When is the station considered ready for handover?
Once the internal and external finishes are complete and all systems have been tested and confirmed operationally efficient, the station is handed over ready to run to the highest quality and safety standards.

What the service covers

  • Turnkey delivery from design through to operation
  • Infrastructure works, concrete bases and drainage networks
  • Supply and installation of fuel tanks and piping networks
  • Electromechanical, fire-fighting and security surveillance systems
  • Pressure and commissioning tests before final handover

Our methodology

  1. 01

    Studies and planning

    Site study and operating requirements, preparation of the drawings, and coordination with the competent authorities to satisfy the regulatory requirements.

  2. 02

    Infrastructure works

    Excavation, backfilling and site levelling, concrete bases, drainage networks and underground service runs.

  3. 03

    Tanks and piping networks

    Installation of the fuel tanks, piping networks and leak-protection systems, with pressure testing of every connection.

  4. 04

    Civil and architectural works

    The station building and service building, metal canopies, dispensing areas, sidewalks and internal roads.

  5. 05

    Electrical and mechanical systems

    Fuel dispensers, control systems, electrical and lighting works, air conditioning, and fire, alarm and surveillance systems.

  6. 06

    Finishes and testing

    Finishes completed and all systems tested, with the station handed over ready for operation to the agreed quality and safety standards.

Contact Us

Get a Free Consultation

Tell us about your project, and one of our engineers will contact you to discuss the most suitable solutions.





    • Completely free consultation
    • We reply within 24 hours
    • Your data stays fully confidential