Civil defence and fire protection works

We deliver fire protection and early-warning systems end to end — design, supply, installation, testing and commissioning — in accordance with Saudi Civil Defence requirements, the Saudi Building Code (SBC) and NFPA standards, protecting life and property and leaving the facility ready for approval by the competent authority.

Service scopeDesign, supply, installation, testing and commissioning
Regulatory referenceCivil Defence requirements, SBC and NFPA standards
Handover documentsTechnical file and test records ready for approval

What civil defence works cover

  • Smart fire alarm systems
  • Automatic sprinkler systems
  • Fire hose reel networks
  • Fire pumps
  • Gas suppression
  • Fire extinguishers
  • Alarm panel programming

Execution methodology

  1. Requirements study and design

  2. Supply and installation

  3. Testing and commissioning

  4. Approval and handover

     

Technical and regulatory reference

  • Saudi Civil Defence requirements
  • Saudi Building Code (SBC)
  • NFPA standards
  • Approved, compliant equipment
  • Approved safety drawings
  • Documented test and commissioning records

We do not treat any system as complete until it has been tested in place and the result recorded in a report attached to the handover file.

Quality and safety control

  • Equipment approved before supply
  • Hold points
  • Point-by-point testing
  • Site safety

What the client receives

  • As-built drawings
  • Test records
  • Approval file
  • Commissioning and training

What the service covers

  • Smart fire alarm systems with addressable panels
  • Sprinkler networks, hose reel cabinets and fire pumps
  • Gas suppression for server rooms and sensitive facilities
  • Supply and installation of fire extinguishers of all types
  • Panel programming, device integration and testing

Our methodology

  1. 01

    Requirements study and design

    Review of the facility's activity and hazard classification, with safety drawings and coverage calculations prepared before procurement.

  2. 02

    Supply and installation

    Approved equipment supplied and networks, heads and panels installed, with routes coordinated against the MEP works.

  3. 03

    Testing and commissioning

    Network pressure testing, pump commissioning, panel programming and a full alarm and evacuation scenario.

  4. 04

    Approval and handover

    Technical file and test records compiled and submitted to the competent authority, with comments tracked until closed.

Contact Us

Get a Free Consultation

Tell us about your project, and one of our engineers will contact you to discuss the most suitable solutions.





    • Completely free consultation
    • We reply within 24 hours
    • Your data stays fully confidential